Laserfiche WebLink
~ av~n g.o-o conc. - page s <br /> 25-Yr, 24-Hr <br /> 10-Yr.24-Hr Storm Event Stonn Event <br /> Peak Peak Effluent Peak <br />u Sedimentation Soillwav Stage (ft) Stage Storage Outflow Settleable Conc Stage Outflow Year <br />Pond Principal Emergency (ft) (soft) (cfs) (mUl) (ft) (cis) Built <br />Grouse #1 8.5 10.0 10.1 2.40 27.5 0.1477 10.3 84.4 1993 <br />Grouse fk2 4.5 8.0 5.5 0.50 28.0 0.0843 8.0 84.2 1993 <br />Sage #1 8.0 10.0 8.8 3.42 15.5 0.0281 9.2 38.9 1994 <br />Sage #2 7.0 9.0 7.8 2.82 10.? 0.0005 8.0 21.4 1994 <br />Oak #1 13.3 15.1 15.1 4.10 28.9 0.01 15.8 70.1 1998 <br />Oak #2 9.8 11.5 11.7 3.05 24.5 0.00 12.2 58.0 1998 <br />I <br />West Flume #1 <br />10.0(3) <br />10.0(3) <br />12.1 <br />3.11 <br />31.5 <br />0.00 <br />12.7 <br />59.4 <br />1997 <br />m <br />d <br />Horse #1 14.0(3) 14.0(3) 15.8 4.95 19.9 0.00 18.2 44.8 2000 <br />Middle Flume #1 11.7(3) 11.7(3) 12.9 2.00 28.7 0.10 13.3 48.8 1999 <br />(1)(2)Middle Flume #2 15.5(3) 15.5(3) 18.3 10.21 187.5 14.78 19.1 307.3 2005 <br />Middle Flume #3 14.0(3) 14.0(3) 18.8 8.38 148.3 0.05 18.0 303.5 1998 <br />E. Mid. Flume #1 13.0(3) 13.0(3) 14.3 7.43 38.7 0.00 14.8 75.0 1999 <br />East Flume #1 11.3(3) 11.3(3) 12.5 3.55 7.3 0.00 13.0 19.5 2000 <br />West Horse 13.0(3) 13.0(3) 13.2 0.87 0.98 0.00 13.3 1.8 2004 <br />(1)(2)Deal #1 2005 <br />(1) Year built for future ponds may vary by + two years. <br />(2) Designs will be seM to CDMG for approval prior to construction <br />(3) Single open-channel design. <br />u~e.roe s~os <br />