Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 02a <br />Date : 07/31/2006 <br />User :' SSS <br />State :Colorado PermiUjob # : M-2006-028 <br />County :Delta Abbreviation :none <br />Site :Reynolds Pit Filename :M028-02a <br />Agency or organization name :DMG <br />Permit or other job action :new 112c application <br />Task description :Rip max 18 acre disturbance <br />HOURLY EQUIPMENT COST <br />Basic machine :CAT 14H <br />Horsepower: 215 <br />Attachment no. 1 :NA Shift basis : 1 per day <br />Attachment no. 2 :Multi-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown Ownership cosUhour : $36.31 NA <br />Grader operatingcost/hour : $40.92 100 <br />Ripper operatingcost/hour : $3.12 100 <br />OperatorcosUhour : $24.47 NA <br />Total unit cosUhour : $104.81 Total fleet cosUhour : $104.81 <br />MATERIAL QUANTITIES <br />Total area to be graded or ripped : 18.00 acres <br />Source of estimated acreage :Mine <br />HOURLY PRODUCTION <br />Selected application :Ripping (0-3 mph) <br />Average grader speed : 1.50 mph <br />Selected blade angle : NA degrees' <br />Effective blade length : NA feet <br />Width of blade overlap per pass : NA feet <br />Net grading or ripping width per pass : 8.50 feet " <br />Unadjusted hourly unit production : 1.5455 acreslhour <br />to <br />at0 degrees, blatle is perpendicular <br />to direction of travel. <br />"width of ripper beam on ripping applications <br />Job Condition Correction Factors Source <br />Average site altitude : 5,000 feet Altitude adjustment factor : 1.00 (Cat HB) <br />Job efficiency adjustment factor: 0.85 (fsh/d, mod.) <br />Net job correction : 0.8500 multiplier <br />