Laserfiche WebLink
• -3 • <br />EXHIBIT C - Flap <br />This map should clearly define the permit boundaries and contain sufficient information <br />to determine the location of the affected land on the ground and existing and proposed <br />roads or access routes to be used in connection with the mining operation. All <br />irmrediately adjacent landowners of record must be shown. The cuarter section corner, <br />section line, or any other locatable points should also be shown on this map. <br />EXHIBIT D - Wildlife, Water Resources, Vegetation and Soils Information <br />Each of the above-mentioned subjects must be addressed as outlined in the applicable <br />RULE. <br />EXHIBIT E - Reclamation Plan <br />As with the mining plan, this should be a general discussion of the methods, equipment, <br />phases or stages of the reclamation process and those portions of land affected by each. <br />If possible, the plan should be closely correlated with the map. If not, the narrative <br />must be comprehensive enough to draw an accurate verbal picture of the expected appear- <br />ance of the area after completion of reclamation. <br />EXHIBIT F - Proof of Compliance with Local Governrrent Zoning <br />In accordance with 34-32-1I5(4)(e), the Board must make a finding that the operation <br />will be in compliance with local zoning or subdivision reculations. You are not <br />required to submit this information, but a submission would assist the Division's pro- <br />cessing of the application. When the Division notifies the local government of the <br />existence of this application, it will request information regarding compliance with <br />applicable Ioca1 law. It is intended that operators may concurrently come into compli- <br />ance with local requirements at the same time the Division is processing this applica- <br />tion. Information regarding the status with local gcvernment will be helpful. <br />EXHIBIT G - Source of Le aal Ri aht to Enter <br />This could be a copy of the lease, deed, abstract of title, or current tax receipt. <br />Rn acceptable alternative would be a statement acknowledged by a notary public that the <br />operator has the Legal right to enter and mine. <br />EXHIBIT R - Reclamation Costs <br />For a 110 permit, if the operator requests financial warranty to be Less than 55,000.00, <br />the operator must submit facts to support such a request. Otherwise, a financial warranty <br />of 55,000.00 will automatically be set. For a1Z 111 permits, the financial warranty shall <br />be 52,500.00 per acre. <br />EXHIBIT Z - Terms of Governmental Contracts (lIl Aooli ca ti ons only) <br />For Special 10-Day (111) permits, 'the operator must submit a copy of the contract or <br />other proof that proves the necessity of a special IO-day permit. The operator must also <br />submit evidence of the financial warranty provided under the governmental contract, if <br />it was reovired. <br />