My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE110843
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE110843
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:07:32 PM
Creation date
11/24/2007 8:03:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
TR-8 , TR-9 to TR-13??
Section_Exhibit Name
EXHIBIT 15 Part 7
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i WATER TREATMENT AND RECYCLE POND N0. 2 <br />General Desion <br />Water Treatment and Recycle Pond No. 2 is a totally incised, zero <br />discharge pond designed to contain approximately 600,000 gallons of water <br />to be recycled from the preparation plant operation. The pond is a lined <br />excavation constructed as part of the water use system and will not remain <br />after final reclamation. It is lined with a synthetic hypalon liner which <br />extends beyond the pond's edges. <br />Pond No. 2 provides water for mining and processing activities. Water is <br />cycled from the preparation plant through Pond No. 2 where sediment <br />unloading takes place. The clean water returns to the plant. Water <br />volume for the preparation plant system is recharged by discharging water <br />from Freshwater Pond No. 3 into Pond No. 2. Sediment is periodically <br />removed from Pond No. 2 in order to maintain the design water level. The <br />area around the pond has been graded so that surface runoff drains away <br />from the pond. <br />The elevation of the design water level in Pond 2 provides for containment <br />of runoff from a 100-year, 24-hour event (0.29 ac-ft) with no discharge <br />while maintaining a minimum freeboard of one foot. The water level in <br />Pond 2 will be maintained at or below the design water level. All <br />hydrology inputs are shown on Table 5a, SEDCAD+ Version 3.0, Pond 2. <br />Refer to Table 5, Water Treatment and Recycle Pond No. 2 - Design Summary, <br />for design results. Water Treatment Pond No. 2's location is shown on the <br />Drainage and Sediment Control Map, (Map 20), and its design drawings, <br />storage capacity table and stage/storage curve are shown on the Water <br />Treatment and Recycle Pond No. 2 and Freshwater Pond No. 3 Designs Map, <br />(Map 22). <br />C~ <br />20 R Revised - March 1992 <br />
The URL can be used to link to this page
Your browser does not support the video tag.