Laserfiche WebLink
Discharge Structures <br />Discharge from sedimentation ponds, <br />dissipaters, riprap channels, and other <br />prevent deepening or enlargement of st <br />balance. Discharge structures will be de <br />Transportation Facilities <br />Existing and Proposed Haulage Roads. The <br />roads at the Seneca 11-W Mine. Haulage Rr <br />the area disturbed by mining and reclamatic <br />as mining proceeds to the south in the II-\ <br />roads are shown on Exhibits 12-2 and 12-3 <br />Road G and can be found in Attachment 13 <br />General Requirements. SCC will construe <br />siltation, air and water pollution and dam. <br />using the best technology currently availat <br />damage to fish, wildlife, or related enviror <br />suspended solids to streamflow or to runof <br />in excess of limitations of State or Federal I <br />• <br />ions and pit dewatering will be controlled by energy <br />rs or devices, where necessary, to reduce erosion, to <br />channels, and to minimize disturbance of the hydrologic <br />I according to standard engineering design procedures. <br />following describes the design and construction of the haul <br />ad G was constructed during the 1992 field season outside <br />t activities. Haul Roads H, I, J, K and L will be constructed <br />I South area. The locations of existing and proposed haul <br />Geotechnical investigations have been completed for Haul <br />maintain and reclaim haul roads to minimize erosion and <br />le to public and private property. To the extent possible, <br />e, haul roads will be designed and constructed to minimize <br />nental values and will minimize additional contributions of <br />outside the permit area. Any such contribution shall not be <br />• <br />\J <br />Donn <br />tr• <br />7r <br />Raviced R/()3 <br />