My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE110719
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE110719
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:07:27 PM
Creation date
11/24/2007 7:58:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987113
IBM Index Class Name
Permit File
Doc Name
RECLAMATION PLAN
Section_Exhibit Name
EXHIBIT E
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~. ~•IIIIIIIIIIIIIIIIIII ~~ <br />,.. <br />RECLAMATION PLAN (cont) <br />EXHIBIT E <br />IRRIGATION <br />No irrigation is planned. The grass mixture is designed to <br />survive and grow under existing natural conditions. <br />WBSD CONTROL <br />There is no way to know how serious a problem weeds will become, <br />but their growth will be monitored carefully each spring for the <br />first couple of years. Weed control will be initiated if the <br />problem becomes serious; the weeds will be mowed where possible in <br />order to avoid chemical damage to grasses. <br />RECLAMATION COST ASSDMPTIONS <br />The mining of two substances from the same lease but from <br />different areas will change substantially the maximum area disturbed <br />at the moment of greatest disturbance. Reclamation costs are estimated <br />assuming that (1) the greatest area of disturbance that will exist , <br />during the life of the mine is 45.00 acres ±, (2) no more than~~~~~^~ <br />30.00 acres f will need to be resoiled at any given time, (3) no <br />more than 24,200 cubic yards of topsoil will need to be spread, j <br />(4) no more than 30.00 acres will need to be reseeded and (5) Thee <br />side sloping will be done as mining progresses. <br />RECLAMATION TIMETABLB <br />The reclamation phases listed below may be correlated to Map <br />Exhibit F. The phases correspond to the mining stages and are <br />numbered accordingly. Note that these are estimates only and <br />variations may occur. <br />ESTIMATED RECLAMATION TIMETABLE <br />Rec. Estimated Acres + _ <br />PhaGe Years Total Slone Reclamation Ditch <br />1 5 28.75 2.60 26.99 0.00 <br />2 5 25.84 0.56 25.23 0.00 <br />3 5 40.96 7.57 32.20 7.11 <br />4 5 46.97 5.22 34.55 6.43 <br />5 5 27.55 1.94 25.28 0.00 <br />6 5 27.35 2.14 24.87 0.00 <br />7 5 2S 9R ~ ~¢ ~ <br /> TOTALS 197.42 24.26 192.32 13.54 <br />16 (amended) <br />
The URL can be used to link to this page
Your browser does not support the video tag.