Laserfiche WebLink
• <br />• <br />r~ <br />iod. <br />~v <br />4 <br />i <br />EOUIPMENi Acker MPS <br />•v <br />• • •~• <br />• >- n • <br />t - <br />SURFACE <br />ar <br />~ too <br />~ ~ ; <br />,~, a <br />~ ~ <br />ELEVATION ft DATE 10 19 95 <br />ma ML• d O N <br /> 0 (1'P) BROWN TOPSOIL <br /> (4 inches) <br /> (CL) LIGHT BROWN CLAY <br /> very silty, low plastiaty, mottled, dry <br /> S- Shelby tube hit rock <br />Shelbyl8'/ 18' <br />y (Sly BROWN to LIGHT BROWN SILTY <br />SAND <br />~ ~~/~. 10 trace of clay, trace of sandstone cobbles, fine- <br />to medium-graic 'dense, dry <br />Started hitting cobh:._ at 113 ft. <br />RQD=25/36=69% Auger refusal at 12_ .:. oa rock, switched to core <br />15 WHTI'E to GRAY SANDSTONE <br />_ blocky, Gttle fraUUred, very hazd, moderately <br />_ ~ strong, little weathered <br />RQD=8/60=L3% _~' Drilling indicates gravel, end wre run at 155 ft <br />(G>~ BROWN to GRAY GRAVEL <br />trace of occasional coarse-grained sand, round <br />20 ~ to subround,chipsfrom boulders and cobbles, <br />_ ~ End core run at 7A.0 ft. <br />RQD=16/60=27% _ <br />~ Terminated boring at 25.0 R, backfilled wii <br />auger cuttings, cement plug and topsoil, no <br />piezometer installed <br />• D Harding Lawson Associates Log of Boring RPE6 FlGURE <br />Engineering and <br />Ernironmenrai Services Mountain Coal, West Elk Mine 6 <br />` Somerset, Colorado <br />DRANM JOB NUMBER APPROVED DATE RENSED DATE <br />LDZ 32640.10 12/95 <br />