Laserfiche WebLink
<br />~XhIBIT B <br />N~ining Plan: <br /> <br />A. Top soil has not been saved in this pit, <br />but some of the overburden has been dozed <br />into piles. This could be used for borrow <br />dirt or for establishing a seed bed as the <br />soil will support vegetation. <br />B. Gravel will be loaded with a large front-end <br />loader into county dump trucks and then hauled <br />to the site of the need. <br />l;. Gravel will be excavated down to the sl-iale. <br />D. The affected area covers less than 5 acres. <br />E. There will be no ground water or surface <br />water rights involved in this operation as <br />there is no water. <br />F. The material to be mined will be sand and gravel. <br />G. There will be a minimal impact on wildlife in <br />the area. <br />