5. HAUL ROADS AND ACCESS <br />It is planned that an access road will wind around the land pads to access al] areas after reclamation. <br />The location of this road is not known and will not be accounted for in the reclamation plan. As <br />stated above, all land pads will be topsoiled, seeded and mulched. <br />6. RECLAMATION TIMETABLE <br />Since mining of the phased areas is concurrent with reclamation, the timetable is somewhat tied to <br />the rate of mining in this area. Since actual sales are difficult to predict, the assumption will be made <br />that the operation will mine and se11450,000 tons of total product per year, on an average The time- <br />table in the mining plan also reflects these rates. The expected reclamation timetable is given below: <br />Task <br /># Description Time Needed <br />months <br />1 Backfill slopes in Area 1 pit from 2H:1V to 3H:1V using overburden <br />from Area 1 mining and overburden from Area 2. 4 <br />2 For Ateas 2,3,4,5, move overburden to reclaim previous areas and <br />create land pads. Ongoing reseeding and mulching of these strips. 211 <br />3 Use overburden placed in the bottom of previous areas and stockpile <br />to backfill the final area land peninsula and slopes. Total of 144,000 <br />cubic yards 2 <br />4 Use topsoil from stockpiles [o place in Pad 5 Area and area of facili- <br />ties. Total of 26,996 cubic yards. .5 <br />5 Move all portable equipment offsite. 0.2 <br />6 Regrade sediment pond. 0.2 <br />7 Ripping or harrowing of any needed areas. (20.1 acres) 0.2 <br />8 Reseed and mulch all recently seeded areas (20.1 acres) 0.2 <br /> <br /> Total Time 218.3 <br />Note that the above reclamation timetable is somewhat different from the mining timetable. <br />15 Road Pit 10/02 29 <br />