Laserfiche WebLink
not been performed, and <br />that reclamation required by law to have been performed upon such lands has <br />ii. that Snancial warranty forfeiture proceedings described in the Act or sinrilar <br />provisions of subsequerrt laws, if arty, Have been initiated. <br />c) The Division, acting for the Board, will enter lands to respond to an emergency only <br />where the Division deterrnines that any of the conditions of Construction Material Rule 8.4.2. exist. <br />7) The additional conditions set forth in the attached rider, if any, are incorporated herein by <br />reference. <br />/~XJ a) Rider is attached. <br />/-/ b) No rider is attached. <br />MINED LAND RECLAMATION BOARD <br />COLORADO DEPARTMENT OF NATURAL RESOURCES <br />RONALD W. CATTANY <br />Division Director <br />