Laserfiche WebLink
RECLAMATION COSTS <br /> Leveling and Grading $100 . 00/acre <br /> 4840 yd. 3/acre at . 02/yd. 3 <br /> Equipment to be used: Loader/Blade/Scraper <br /> Topsoiling $1,020 .00/acre <br /> 1854 yd. 3/acre at $ . 55/yd. 3 <br /> Equipment to be used: Loader/Dump truck/Blade <br /> Reseeding $97.00/acre <br /> Cost of seed: $67. 00/acre <br /> Labor and equipment cost: $30. 00/acre <br /> Equipment to be used: Drill <br /> • Total cost of reclamation/acre $1, 217. 00/acre <br /> Total cost of reclamation this site $138, 628. 50/acre <br /> 41. 5 acres lake at $100 . 00/acre <br /> 110. 5 acres dry land at $1 ,217 . 00/acre <br /> Maximum acreage disturbed at a given time: 55 acres $61 , 342 . 00 <br /> Maximum bond f �? <br /> o <br /> 55 acres (45 acres dry; 10 lake) $55 ,765 <br /> h _ <br /> Administrative costs (10%) $ 5 , 577 h <br /> H-1 <br /> • <br />