Laserfiche WebLink
• Figure G-1 <br /> Particulate Emission Calculations <br /> 1. Mining <br /> Emission Factor = 0 . 1 lb/ton (Ref. 1) <br /> Production Rate = 250, 000 tons/year <br /> Operation 5 days/week, 52 weeks/year <br /> Annual: 0 . 1 x 250,000 = 25 ,000 lb/year = 12 . 5 ton/year <br /> 24-hour: 25,000 x 1 = 96. 2 lb/day = 4 . 0 lb/hour <br /> 5x52 <br /> 2. Crushing <br /> Emission Factor = 0 . 0015 lb/ton (Ref. 2) <br /> Production Rate = 250 ,000 tons/year <br /> Operation 5 days/week, 52 weeks/year <br /> Control = 500 (wet suppression) <br /> Annual: 0. 0015 x 250 ,000 x 0 . 5 = 187. 5 lb/year = 0 . 094 ton/yr. <br /> 24-hour: 187. 5 x 1 = 0 . 72 lb/day = 0 . 03 lb/hour <br /> 5x52 <br /> 3. Storage Pile Wind Erosion <br /> Emission Factor = 0 . 11 lb/ton (Ref. 3) <br /> Throughput = 250 , 000 ton/year <br /> Storage 365 days/year <br /> Annual: . 0 . 11 x 250,000 = 27 , 500 lb/year = 13. 75 ton/year <br /> 24-hour: 27 , 500/365 = 75 . 3 lb/day = 3 . 14 lb/hour <br /> 4 . Conveying and Handling <br /> Emission Factor = 0 .02 lb/ton (Ref. 4 gives a factor of <br /> 0. 2 lb/ton; this factor is unreasonably large for gravel <br /> • products which will normally be wet. A value of 0 .02 has <br /> been assumed on the basis of experience and professional <br /> judgement) <br /> Production Rate = 250 ,000 ton/year <br /> Operation 5 days/week, 52 weeks/year <br /> /• Annual: 0.02 x 250,000 = 5000 lb/year = 2. 5 ton/year <br /> l 24-hour: 5600 x 1 = 19 .2 lb/day = 0 . 80 lb/hour <br /> 5x52 <br /> Continued next page <br /> G-21 <br />