My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE110599
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE110599
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:07:21 PM
Creation date
11/24/2007 7:52:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
5/12/2003
Doc Name
pages 2.05-1 through 2.05-58i
Section_Exhibit Name
Rule 2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 2.05.3 <br />(4) Ponds, Impoundments and Diversions <br />(a) There will be three sediment ponds constructed for the mine facilities. The <br />ponds are named sediment ponds B, C and D. Sediment pond D will also <br />be referred to as the refuse pile sediment pond. The loadout will have two <br />sediment ponds. The ponds are named sediment ponds J and K. <br />Sediment pond A was deleted from the design. <br />Sediment pond B was relocated below (south of) old State Highway 133 <br />during the construction of the downhill conveyor and highway coat stockpile. <br />It is designed to handle the run-off from B-Gulch. Pond B will be a typical <br />sediment pond, capable of containing the run-off from a 10-year event with <br />a spillway system designed to handle the peak flow generated by the 25-year <br />storm event. <br />Sediment pond C is located above (north of) the old Bowie railroad grade <br />and is designed to handle the run-off from C-Gulch. Sediment pond C also <br />• receives inflow from the mine. A sediment pond is to provide adequate <br />capacity to contain or treat the run-off or inflow entering the pond as a result <br />of a 10-year, 24-hour precipitation event and any additional storage resulting <br />from the inflow from any underground mine. The calculations presented in <br />Volume III, Exhibit 8, pages 7 and 8, show Pond C has adequate capacity to. <br />contain inflow from the mine and the 10-year, 24-hour precipitation event. <br />Pond C has and emergency spillway system designed to handle the peak <br />flow generated by the 25-year storm event. <br />Sediment pond D is the refuse pile sediment pond. It is designed to handle <br />the run-off from the entire refuse pile area. There is an upper diversion ditch <br />designed to divert run-off away from the top of the refuse pile. See Volume <br />4, Coal Mine Waste Bank Final Design for details of this sediment pond and <br />upper diversion ditch. <br />Sediment pond J is located south of the tracks below topsoil stockpile F. <br />There is a berm/upper diversion ditch designed to divert upland drainage <br />away from the topsoil stockpile. Pond J is a typical sediment pond, capable <br />of containing the run-off from a 10-year event with a spillway system <br />designed to handle the peak flow generated by the 25-year storm event. <br />I• <br />PR-07 2.05 - 29 - 2/03 <br />/~ PR/QOV6D <br />5 ~tz~o 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.