• 2.05.3 <br />The embankment specification presented above applies to this road <br />segment. <br />Drainage <br />The discussion of drainage presented above under the discussion of the <br />main haul road is applicable to this road segment. <br />Haul Road Reclamation <br />The haul road from old State Highway 133 to the portal area will not be <br />totally reclaimed, Asphalt surfacing will be removed from the entire road <br />surface. The waste asphalt will either be recycled or placed in the gob pile <br />for final disposal. The road bed will be narrowed from a travel width of over <br />24 feet to a travel width of 14 to 16 feet. The road is to be left in place so the <br />light use roads on the property are reestablished after reclamation. Map 18, <br />Post Mining Topography showsthe road is rerouted in the facilities area after <br />the area is reclaimed. The rerouted road is designed to connect to the <br />• existing light use roads. This road reclamation plan is compatible with the <br />postminig land use of rangeland and wildlife habitat since roads are <br />necessary to manage both land uses and a light use road network was <br />existing on the property prior to mining. <br />Three culverts will be left in place to provide for drainage from C-Gulch. <br />These culverts are located where the haul road crosses the ephemeral <br />drainage channels. The three culverts (C-C6, C-C8 & C-Cg) are 36-inch <br />diameter. All of the culverts are designed to pass the 10 year precipitation <br />event. Water bars will be utilized to control the drainage from the postmining <br />light use road. <br />The landowner and the applicant are the same entity. Through this permit <br />application the landowner approves the reclamation plan to leave the <br />culverts and light use road in place. <br />A discussion of the access and light use roads in the permit area follows: <br />An access road will be constructed from the portal bench to the utility bench <br />as shown on the Facilities Map 15-2. The road is a total of about 1600 feet <br />. long with the maximum grade of 12%. This access road will provide access <br />to the water tank and substation and provide the necessary tie to the light <br />PR-07 <br />2.05 - 24 - 2/03 <br />R PPRoVeD <br />s/IZ~o3 <br />