Facility Areas. After the buildings are demolished and disposed, the site is reclaimed. <br />Three feet of material wi 11 be ripped in the facilities area. The top one foot of • <br />gravel/scoria surfacing on the parking/storage areas will be dozed into a cut or low area <br />adjacent to the facility. This material will be covered during the grading process. <br />Concrete foundation areas will be hauled to a railroad cut area for disposal. The three <br />monitoring wells will be properly abandoned. <br />Miscellaneous Otilities. Underground utility reclamation, including phone lines, water <br />lines, and powe rl fines, will be abandoned in place. <br />Sediment Ponds. The two sediment ponds will be totally reclaimed. Location of all <br />impoundments can be found on Exhibit 12-2. Material adjacent to the ponds will be used to <br />fill the ponds in. <br />Road Reclamation. There are approximately 2000 ft. of haul roads that will be reclaimed, <br />and 2900 feet of ramp roads that will be reclaimed. It was assumed that this could be <br />accomplished in three 8-hour shifts by a D10N dozer. *** <br />Railroad. The track and ties will be removed from the site. Costs for this operation <br />were determined using MEANS. Ballast will be picked up and loaded by scraper to cut areas <br />that will be covered with adjacent slope material. Please see FPC sheets for calculation <br />of ballast removal costs. Cut areas will not require the disposal of ballast material due <br />to the fact that these areas will be filled in anyway. <br />Prior to pushing material into a cut area, the topsoil will be dozed out of the way. <br />Once the area has been graded, the topsoil will be respread with dozers. After the areas <br />have been topsoiled, then revegetation can take place. <br />Coal Stockpile. It is assumed that 50 percent of the coal stockpile would have to be <br />disposed. This material is in close proximity to the railroad cut that has to be filled <br />in. It can be pushed to the cut area and covered with four feet of suitable material from <br />the side slopes. <br />Finish Grading. A cost has been estimated to finish grade the area with a D11N Dozer. <br />This was based on CDMG estimated time frame of 67.31 hours. '** <br /> <br />q Revised O6/00 <br />