Laserfiche WebLink
Bonding Summary <br />The preceding revised information demonstrates that the entire loadout area can now be <br />reclaimed for $826,880. The CDMG currently holds $862,120 in reclamation bonds for the <br />loadout facility. Salvage value was not allowed for any of the structures even though a <br />scrap steel dealer would probably pay for much of the salvageable steel. The railroad <br />rail and wooden ties were assumed to be disman[1etl and loaded off site. According to the <br />updated reclamation bond Calculation, the bond currently held by CDMG is sufficient to <br />cover reclamation costs for the loadout. <br /> <br />`J <br />10 Revised 06/00 <br />