Laserfiche WebLink
HAYDEN GULCH TERMINAL, INC . <br />2000 TR-S- HAYDEN GULCH LOADOUT <br />RECLAMATION BOND CALCIILAT ION - SVMMARY SHEET Paxt 1 of 2 <br />DIRECT COSTS <br />Hackfilling and Gxadinq <br />Loop Track = $27,596 <br />Rail Spur - _ $18,400 <br />Ballast Removal = $9,871 <br />Facilities Area = 512,056 <br />Facilities Area (Ripping) _ $4,128 <br />Ponds = $1,113 <br />Leach Field = $1,113 <br />Raul roads = $4,759 <br />Haul Roads (Ripping) _ $2,085 <br />Final Grading = $9,533 <br />Total Backfilling S Grading = $90,654 <br />Topsoil Replacement <br />Topsoil Replacement $84,067 <br />Total Topsoil Replacement = $84,067 <br />Revegetation <br />Mine Area Revegetation = $82,657 <br />Total Revegetation = $82,657 <br />Facilities <br />Structure Demolition $246,771 <br />Well Abandonment $815 <br />Culverts = $70,167 <br />Dredge Ponds = $26,999 <br />Grade Ditches = $4,654 <br />Coal Stockpile $16,937 <br />Total Facilities = $366,343 <br />Miscellaneous Items <br />Repair Rills and Gullya = $17,147 <br />Total Miscellaneous = $17,147 <br />TOTAL DIRECT COST9 = $640,868 <br />`J <br />8 Revised 06/00 <br />