Laserfiche WebLink
VOLUME II-C <br />LIST OF EXI3IBITS <br />18 Baseline Environment Report for Proposed Coal Mine Expansion <br />19 Fish and Wildlife Resources Information: Eckman Pazk Permit Area <br />19a Raptor Survey - EMD <br />19b 1997 Raptor Nesting Studies <br />20 Aquatic Biological Survey of Middle Creek and Fish Creek <br />21 Aquatic Biological Survey of Foidel Creek and its Unnamed Tributary <br />22 Aquatic Biology Monitoring Survey of Foidel Creek <br />23 U.S. Fish and Wildlife Service Letter Regazding T & E Species <br />23a Required Lease -Permanent Road Fish Creek (Project Letter from Chevron) <br />24 Soil Conservation Service Letter <br />25 As-Built Certifications of Access/Iiaul Road <br />25a Refuse Pile Fire-Fighting Plan <br />25a-2 Raised Bore Cuttings Engineering Report <br />I 25b Roadway Certification Letter, Haul Road B <br />25c Pavement Evaluation & Recommendations, Haul Road B <br />25d Roadway Certification Letter, Haul Road B <br />25e Roadway Certification Letter, Haul Road C <br />25f Roadway Certification Letter, Refuse Pile Haul Road <br />25g Roadway Certification Letter, Explosive Area Access Road <br />25h Roadway Certification Letter, PM Bay Access Road <br />25i Roadway Certification Letter, Pond A Access Road <br />25j Roadway Certification Letter, Rock Dust Bin Access Road <br />25k Roadway Certification Letter, EMD Bleeder Shaft Access Road <br />251 Roadway Certification Letter, Batch Load-Cut Access Road <br />25m Roadway Certification Letter, FCM #.1 Access Road <br />25n Refuse Pile North Access Road <br />25o Haul Road A Design <br />25p Pavement Evaluation and Recommendations, Fish Creek Borehole Access Road <br />25q Certification of HR Between Refuse Pile HR, Fish Creek Borehole Access Road <br />25s NW Mains Vent Shaft Access Road <br />26 Sedimentation Pond F -Design Adequacy <br />TR OS-45/46/47 viii Revised -January 2005 <br />