Laserfiche WebLink
-- <br />~II ~I~II~~I~I~~~ ~I~ <br />sss <br />~~ Banks and Gesso, LLC <br />~~ <br />June 14, 2001 <br />Thomas A. Schreiner <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br /> <br />720 Kipling St.,Suite117 <br />Lakewood. Colorado 80215 <br />Fax ~dF~ <br />nksandgesso.com <br />18 1001 <br />Division of Minerals and Geology <br />RE: Second Response to Green/Croissant Property, Regular 112 P.dequacy Revie:~~, <br />DMG File No. M-2001-022 <br />Dear Mr. Schreiner: <br />The following response to the remaining adequacy review concerns for the <br />Green/Croissant Property Regular 112 Application (File No. M-2001-022) has been <br />prepared for your review and consideration. The responses below address each of your <br />concerns in the order they were presented in your letter of June 8, 2001. <br />6.4.3 EXHIBIT C -Pre-mining and Mining Plan Map(s) of Affected Lands <br />The Applicant will provide either a Structure Agreement from Machi-Ross <br />Petroleum Company, an engineering evaluation, or proof that the structure has <br />been completely abandoned and title conveyed to Loveland Ready Mix Concrete, <br />Inc. <br />6.4.4 EXHIBIT D -Mining Plan <br />2. Upon appro~~al, a Spill Prevention Containment and Control (SPCC; Plar, `.a~ill be <br />forwarded to the Division of Minerals and Geology (DMG) if submitted to either <br />the Weld County Health Department or the CDPHE. Neither Rule 3.1.6(1), nor <br />the enabling statute (C.R.S. 34-32.5-116(4)(h)) indicate that the DMG is qualified <br />or authorized to review SPCC plans if the agencies responsible for reviewing <br />such plans, as listed above, do not deem such a plan to be necessary. For the <br />purposes of DMG review, the Applicant submits that, due to storage of chemicals <br />in above ground tanks, it has been required to construct a spillage retention berm <br />of adequate size to contain a spill from the largest container on-site (Weld <br />County Site Development Standard 21). In the event of a spill, the operator <br />would engage an approved disposal company, as required to remove any <br />persistent chemicals. <br />