Laserfiche WebLink
-3- <br />b) The Board will enter the lands to perform reclamation only if the Board has determined: <br />i. that reclamation required the permit, statute, or regulations to be performed upon such <br />lands has not been performed, or <br />ii. that fmancial warranty forfeiture proceedings described in the Act or similar provisions <br />of subsequent laws, if any, have been initiated. <br />c) The Division, acting for the Board, will enter lands to respond to an emergency only where the <br />Division determines that any of the conditions of Construction Material Rule 8.4.2. exist. <br />7) The additional conditions set forth in the attached rider, if any, are incorporated herein by reference. <br />/_/ a) Rider is attached. <br />/ XX / b) No rider is attached. <br />MINED LAND RECLAMATION BOARD <br />COLORADODEPARTMENT OF NATURAL RESOURCES <br />/ a, I <br />~r.GCGL <br />RONALD W.CATTANY <br />Division Director <br />