Laserfiche WebLink
EXHIBIT E <br />RECLAMATION PLAN <br />ONCE TSE RAW MATERIAL HAS SSSN MINED TSE OVSRBIIRDSN SHALL BS <br />PLACED ATOP THE NSW PIT PLOOR AND SIDES. TOPSOIL IS THEN LAYERED <br />OVER THE TOP OF TSE OVSRBIIRDEN TO A MINIMUM DEPTH OF 6 INCHES. <br />ALL SIDS SLOPES SBALL NOT 8%CEED 3:1. RSFSRRItIG TO EXHIBIT C, <br />THE E%ISTING PO-PER LINE STRIICTIIRSS SHALL HAVE THEIR SIDE SLOPES <br />COM~iCING AT A 50 FOOT RADIIIS FROM NATIIRAL GROIIND DOWN TO THE <br />PIT FINISH FLOOR. THS FINISH PIT FLOOR SHALL HAVE A MINIMUM <br />SLOPS TO PROVIDE DRAINAGE WESTERLY. TSB SEEDING WILL CONFORM TO <br />RECOMMBNDATIONS OF SOIL CONSERVATION SERVICE (REFER TO E7CHIBIT I) <br />IN TYPE, CONTENT AND VOLIIMS. RECLAMATION SHALL BE BASED IIPON THE <br />SIMILAR CYCLE AS OPERATIONS OF MINING (EXHIBIT D). THE PROPOSED <br />COMPLETION OF RECLAMATION SHALL BE TO RESTORE THE GRAVEL PZT SITE <br />BACK TO ITS CURRENT STATIIRS AND IISS BEING ONE OF OPEN GRAZING <br />LANDS. <br />