My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE110240
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE110240
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:07:07 PM
Creation date
11/24/2007 7:37:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
7/10/2003
Section_Exhibit Name
Exhibit 69 Section A I. Initial Project Description
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mountain Coal Company Exhibit 69 <br />West Elk Mine Sylvester Gulch Facilities <br />Distribution Road <br />A 1400 foot light use road, at an average grade of 7.5%, for distribution power line <br />maintenance access will be built from the substation southward connecting to the <br />shaft site haul/access road before it crosses Sylvester Gulch. Total excavation for <br />this road will be approximately 14,500 cubic yards of which 3,000 cubic yards is <br />topsoil which will be salvaged and stockpiled. Total fill will be 4,800 cubic yards, <br />which will be provided from excavated material. Surplus excavated material will <br />be used for fill at other road locations. <br />Electric Borehole Road <br />A 2,100 foot light-use road, at an average grade of 7.5%, will access the electric <br />borehole location from the southeast end of the shafts site construction ]aydown <br />bench. Total excavation for this road and pad will be 40,400 cubic yards of which <br />7,000 cubic yards is topsoil which will be salvaged and stockpiled. Total fill will be <br />19,500 cubic yards, which will be provided from excavated material. Surplus <br />excavated material from the site will be used for fill at other road locations. <br />Construction Schedule for Ventilation Shafts #1 and #2 <br />Construction of the Shafts #1 and #2 and permanent facilities at the shafts site will <br />commence after the drainage/sediment control features, benches, roads and other facilities <br />outlined previously are in place. Construction of temporary facilities by the contractor <br />will include construction hoisting equipment, supply storage, water storage, electrical <br />switchgear and temporary bath house/office facilities. These facilities will be located on <br />all three benches within the sediment control area. The contractor will begin excavating <br />the intake shaft soil material down to bedrock and temporarily stockpile this subsoil <br />material on the far west bench. This material will be removed periodically by haul truck <br />to a subsoil storage pile located near the new substation. The total volume of subsoil is <br />approximately 8,000 cu. yds. from both shafts. <br />I I Nr v. 1996 PRO7R; Revised Mur 1997 A9R21h <br />Revised Jul. 7997 MR2/9; Revised June 1003 MR297 <br />