Laserfiche WebLink
<br />r <br />• collection ditch are included in Appendix A, Drainage Design <br />Information. <br />(2A and 28) Area between Pit 2 and 3 east of tl:e road to Pit 2, and tl~e <br />area west of the south inlet to Pit 3. <br />Response (2A and 2Bj: These areas have been reclaimed and <br />effective drainage has been reestablished as demonstrated by <br />Appendix D, Sedimentation Pond Retention/Reclamation. Rockcastle <br />respectfully requests that the Division review this information and <br />release these areas from the requirement for continued sediment <br />control. <br />(2C and~2D) The west and east ends of Pit S. <br />Response (2C and 2D1: These comments repeat the concerns <br />previously noted in Comment 3 (Pit 5/6). Please see the <br />corresponding response. <br />(2E) The area north of (below) the aspen necv the shop at Pit 5. <br />Response (2E1: As noted in the previous response to Comment 3 (Pit <br />5/6) designs for Ditch 5-1 are included in Appendix A, Drainage Design <br />Information. Rockcastle also proposes specific remedial measures to <br />~ eliminate certain culverts and modify ditches to improve and simplify <br />drainage control in this area. These changes are reflected in both the <br />~~ <br />Postmining Drainage and Sediment Control Map, (Map R-1} and <br />Appendix A, Drainage Design Information. <br />• (3A and 3B) Culvert on the diversion ditch on the north side of Pit 5 below <br />the road to Sage Creek, and the culvert on the collection ditch just north of <br />the aspen near the old shop location. <br />•8- <br />