My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE110220
DRMS
>
Back File Migration
>
Permit File
>
200000
>
PERMFILE110220
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:07:06 PM
Creation date
11/24/2007 7:37:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981039
IBM Index Class Name
Permit File
Doc Name
Rockcastle 5/6 11/26/91
Section_Exhibit Name
Reclamation Project Binder
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• METHODOLOGY AND ASSUMPTIONS <br />The required hydrology, sedimentology, and hydraulic calculations for the Grassy <br />Creek Mine permanent drainage structures were performed utilizing a combination <br />of hand calculations and the SEDCAD+ computer model developed by Civil <br />Software Design. SEDCAD+ is a third generation hydrologic and hydraulic <br />calculation model designed for use on IBM compatible computers. <br />Measurements for premine hydrology and sedimentology parameters for Pits 5 <br />and 6 were taken from the Reclamation Map in the Rockcastle Permit. This map <br />was developed prior to mining related disturbance and best represents the <br />premine configuration. Premine measurements for Pits 3 and 4 were assumed to <br />be similar to Postmining conditions. Postmine measurements for Pits 2, 3, 5 and <br />6 were taken from the Postmining Drainage and Sediment Control Map (Map R-1). <br />The Postmining Drainage and Sediment Control Map was developed from the <br />• Reclaimed Topography (1990) & Bond Release Documentation Map, which reflects <br />aerial photography from a flight in October of 1990. Postmine topography for Pits <br />5 and 6, shown on the Drainage and Sediment Control Map was developed by <br />hand. <br />HYDROLOGY <br />Hydrology calculations were performed utilizing the SEDCAD+ computer model. <br />Computer printouts including hydrology inputs and results are contained in Exhibit <br />1, SEDCAD+ Computer Printouts. <br />SEDCAD+ Hydrology Calculations <br />The SEDCAD+ model calculates runoff and peak flow via a numerical modeling <br />technique based on user inputs of runoff basin information and design storm. <br />Design storm inputs include rainfall amount and duration, selection of a rainfall <br />• distribution, and convolution increment. Hydrographs are developed on a <br />subwatershed basis with the input of area, time of concentration, SCS curve <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.