Laserfiche WebLink
<br />• III III III IIIIIII III • <br />999 STATE OF COLORADO <br />MINED LAND RECLAMATION DIVISION oF,~o~ <br />Department of Natural Resources <br />7373 Sherman St <br />Roam 275 ~~~> <br /> <br />N<~ g <br />., <br />Denver, CO 80203 ' ' <br />303 R66-3567 '•i <br />6 •• <br />FA%:303 832-8106 e7 <br /> Roy Romer. <br />A ril 17 1991 <br />p ~ Dovemor <br /> Fred R. Banta. <br /> Division Director <br />Mr. Benny Jensen <br />P.O. Box 676 <br />Meeker, Colorado 81641 <br />Re: M-91-009, White River S & G, Permit Issuance <br />Dear Mr, Jensen: <br />On April 17, 1991, the Mined Land Reclamation Division found Benny Jensen to <br />have satisfied the applicable requirements of C.R.S. 34-32-101 et seq. for <br />obtaining a mining and reclamation permit. Therefore, a permit'is3eing <br />issued. Two signed originals of the permit have been executed. We have kept <br />one copy for our files and are enclosing one copy for your use. Please read <br />the terms of the permit. It is your responsibility to comply with all of the <br />terms of the permit. As a reminder, here are a few things we feel are <br />important. <br />1. All of the original application materials, as amended and supplemented, <br />are an integral part of your permit. They have been incorporated into the <br />permit by reference. We presume that you have a copy of all of these <br />materials; therefore, none have been enclosed with this mailing. We suggest <br />that you keep a copy of the permit and the permit application at the mining <br />operation as a reference for operating personnel, to help ensure compliance <br />with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those <br />described in the permit may require a revision to the permit. We suggest <br />consulting the Minerals Rules and Regulations and/or contacting us to <br />determine if a revision to the permit is necessary. Rule 1.8 pertains to <br />Amendments, Rule 1.9 to Technical Revisions, and Rule 1.10 to Conversions. <br />3. On your permit anniversary date each year, April 17, you mist submit an <br />annual fee and an annual report to us. The annual fee for this permit is <br />E50.00. Please consult Rule 3.4 for 110 Permits, and Rule 2.4 for 112 <br />Permits, and Statute Section 34-32-116(1)(a) for 111 Permits, for the specific <br />annual report requirements applicable to your mine, <br />If you have any questions, please contact me. <br />Si 1 ~ <br />~- / y< <br />Direr for <br />FRB/GRS/DLM/eke/1737G <br />Enclosures <br />