Laserfiche WebLink
<br />$ 1.888.89 <br />$ 39,666.62 <br />EXHIBIT "L" <br />Revised February 26, 1999 <br />Page 2 of 2 <br />Reclamation Cost $33,402.06 <br />1.55% Public Liability [ns. 517.73 <br />1.55% Contractor Performance Bond 517.73 <br />10% Profit $ 3.340.21 <br />$ 37,777.73 <br />5%DMG Administrative Fee <br />$39,666.62 ; 30 A = <br />i <br /><-- Direct Reclamation Cost <br />Direct Cost plus OHP <br />Total Performance Bond Amount <br />$ 1,322.22/Acre <br />"DETAIL BELOW" <br />$33,402.06 Direct Reclamation <br />$ 517.73 Public Liability Insurance <br />$ 517.73 Contractor Performance Bond <br />3 340.21 Contractor Profit <br />$4,375.67 Contractor OHP <br />DMG Administrative Exp. <br />5% 1 888.89 <br />$6,264.56 Total Indirect Cost <br />Total Indirect Cost -Reclamation Cost <br />$6,264.56 ; $33,402.06 = 18.76% <br />