Laserfiche WebLink
u <br />TABLE ZO-1 <br />POST MINING LANDFORM MASS BALANCE <br />Area I Area 2 <br />• <br />• <br />Pre-Mining Pit Material Volume Calculations <br />Pre-Mining Material Volume <br />Virgin Overburden Material Volume <br />Total In-place Coal Volume <br />Recoverable Coal~Volume <br />Non-recovered Coal and Paving Material Volume <br />Pre-Mining Overburden Volume <br />Total Pit Spoil Volume <br />Pre-Mining Material Mass Volume: <br />Total Pit Spoil Volume <br />Tota! Pre-Mining Material Volume <br />Post Mining Material Volume Calculations <br />Post Mining Spoil Material Calculated: <br />Post Mining Spoil Material Volume ftnternail <br />Post Mining Spoil Material Volume fExternall <br />Total Post Mining Spoil Volume <br />Post Mining Overburden Material Excavated <br />Pre-Mining Total Pit Spoil Volume <br />Post Mining Overburden Material (External) <br />Total Overburden Material Excavated (Swelled) <br />Post Mining Material Volume Comparison <br />Total Post Mining Spoil Volume <br />Total Overburden Material Excavated <br />Volume Difference <br />4 <br />12,404,306 bcy 31,738,823 bcy <br />9,623,200 bcy 27,087,354 bcy <br />2,781,106 bcy 4,651,469 bcy <br />2,526,900 bcy 4,186,322 bcy <br />254,206 bcy 456,147 bcy <br />9,877,406 bcy 27,552,501 bcy <br />11,062,694 Icy 30,858,801 Icy <br />11,062,694 Icy 30,858,807 Icy <br />72,404,306 bcy 31,738,823 bcy <br />9,967,208 cy 31,502,979 cy <br />186,012 cv - <br />10,153,220 cy 3T,502,979cy <br />11,062,695 cy 30,858,801 cy <br />99,612 cv <br />11,162,577 cy 30,858,801 cy <br />10,153,220 cy 31,502,979 cy <br />11,162,577 cy 30,858,801 cv <br />1,009,357 cy 644,178 cy <br />Revised 2/99 <br />