Laserfiche WebLink
• Surface treatment of graded spoil is discussed in Tab 21, Minesoil Reconstruction. Small depressions are <br />not planned at this time; however, 'rf small depressions are needed to conserve moisture, minimize erosion, <br />create and enhance wildlife habitat or assist revegetation, plans will be submitted for approval prior to <br />construction. Tertaces are not planned for the Yoast Mine. <br />SCC does not anticipate any grading problems but shall monitor the success of the backfilling and grading <br />program at least annually. This monitoring will include visual inspections of areas graded to determine <br />progress of grading activities and any settling of graded areas. In addition to visual monitoring, a <br />topographic map will be generated from photogrammetric methods of areas backfilled and graded on an <br />annual basis. This topographic map will be evaluated to determine if the final graded topography is <br />consistent with fhe proposed post mining topography and land use. The topographic map will <br />TR-25 2a Revised 4/04 <br />