Laserfiche WebLink
v / <br />Subsidence Handbook Volume III, Exhibit 15 • <br />Surface Water Resources -PONDS & STREAMS <br />Introduction <br />Surface water resources within the permit area consist of stockponds and ephemeral and <br />intermittent streams. These resources should not be affected by change:> in surface <br />gradient or total subsidence resulting from development of a subsidence profile. <br />stockponds and streams were identified during a hydrologic reconnaissance of the permit <br />area. <br />Worst Case Damaoe <br />The ponds could be damaged and drained by a subsidence crack that would occur directly <br />below the pond. Flow through ephemeral and intermittent drainages could temporarily be <br />effected by a subsidence crack across a stream channel. <br />Pre-Damage Monitorinq <br />On-site inspections of significant ponds are done during hydraulic monitoring. At that time, <br />field parameters of pH, conductivity, and temperature are taken. See water monitoring <br />section. Water samples are analyzed per DMG approved monitoring parameters on a <br />approved schedule. Results are documented, pictures of features are taken, and results <br />submitted to DMG in the "Annual Subsidence and Hydrology Report". Stream channels <br />will be monitored as persons travel throughout the permit and adjacent area during <br />scheduled environmental resource monitoring. Additionally, the DMG and the surface <br />management agency will be notified within 48 hours if any subsidence related pond or <br />stream channel damage is discovered. <br />Any subsidence-induced problems identified bythe environmental resource monitoring will <br />be documented. All of the ponds are presumably used by wildlife. <br />Post-Damage Monitoring <br />The post-damage monitoring will be the same as pre-damage monitoring. <br />Minino Techniques <br />Longwallorconventionalroom-and-pillartechniqueswith pillar extraction will be conducted <br />PR-04 36 02/01 <br />PQ-y <br />