Kvaerner Metal ~ Project No. 306900 <br />Gener ecification No. GC-78 <br />Geosynthetic Liner <br />The subgrade surface. on which the HDPE will be placed. shall be compacted smooth to <br />the regwred density and shall be free of rocks and sharp particles. Atl such partfctes <br />shall be removed by raking, broomrng, or hand picking as necessary just prior to the <br />placement of the liner. The surface shall be inspected and approved by the Engineer. <br />Horizontal field seams on slopes shall be kept to a minimum. Seams shall be made by <br />lapping the uphill panels over the downhill panels. <br />The HDPE panels shall be placed over the prepared subgrade one at a time and shall be <br />seamed to the adjacent panels immediately after placement. Adequate temporary <br />anchoring of the panel shall be provided to protect the material from damage due to the <br />wind. Geotextrle fabric may be regwred under the membrane panels in rough areas, <br />when requested by the Engineer. All personnel working or walking on the deployed <br />panels shall wear sofr-sole shoes. <br />The HDPE shall be installed in a relaxed condition and shall be free of tension or stress <br />upon completion of the work. Stretching of the matenai to fit. will not be allowed. <br />Plastic sand bags shall be used. as regwred, to hold the liner panels in position during <br />installation. flags shall be sufficiently close knit to keep the fines from working through <br />the bottom. sides or seams of the bags. Each bag shall contain adequate quantity of <br />sand and shall be tied closed after filling. Sand bags, rf used to ballast the liner, shall be <br />removed after the joints are fused together and the permanent anchorages are complete. <br />Continuous loading is required along leading edges of panels. in case of high wind. <br />Anchor trenches shall be excavated by the Contractor to the lines and grade shown on <br />the drawings. Slightly rounded edges shall be provided, where HDPE adjoins the trench. <br />to avoid sharp bends in the material. <br />Anchor trenches shall be backfilled and compacted as directed by the Engineer. Care <br />shall be exercised in backfillinq the trenches as to prevent any damage to the liner. <br />Panel placement shall not proceed at an ambient temperature below a0°F (5°C), or <br />above 104'F {40'C) as measured at HDPE surface. Deployment shall not be done <br />during any precipitation. in the presence of excessive moisture, in an area of ponded <br />water. or rn the times of excessive winds. <br />Seaming of joints shall be done by extrusion process, using the manufacturer's <br />recommended procedures and equipment. The surfaces of joint shall be cleaned of <br />motsture, dust, dirt, debris and oxidation, not mare than one hour prior to welding. <br />S.U WORKMANSHIP <br />Prior to commencing the work. Contractor shall certify, in writing, that the surface on <br />which the HDPE viol be installed is acceptable. Thereafter, it shall be the Contractors <br />resportsrbitity to maintain the prepared soil surface. Any damage to the subgrade <br />caused by this installation shall be repaued at Contractors expense. The sod surface <br />shall be observed daily by the Contractor to evaluate the surface condition. Changes in <br />~ ~y0wy~ptlhR171~{1Ci1GC101VC OoC. Rw NI 7 Vwr hp~ 1t. 1~ <br />