Laserfiche WebLink
<br />Revegetation Cost Per Acre <br />Revegetation Bonding - Seneca II <br />Seedbed Preparation Cost/AC. <br />D-SH Tractor + Operator <br />561.30/hr x 0.5 hr/ac E 30.66 <br />Offset Disk (10'-14') <br />55.00/hr x 0.5 hr/ac 2.50 <br />Total E 33.16/ac <br />Drill Seeding Mix 1 <br />D-SH Tractor + Operator <br />561.30/hr x 1.0 ac/hr S 61.30 <br />Drill Seeder <br />515.00/hr x 1.00 ac/hr 15.00 <br />Seed Mix 1 180.00 <br />Total 5256.30 <br />Drill Seeding Mix 2 <br />D-SH Tractor + Operator <br />561.30/hr x 1.0 ac/hr E 61.30 <br />Drill Seeder <br />515.00/hr x 1.0 ac/hr 15.00 <br />Seed Nix 2 70.00 <br />Total 5146.30 <br />Broadcast Feeding Mix 1 <br />Laborer + Broadcast Seeder <br />513.04/hr x 1.0 ec/hr E 13.04 <br />Seed Nix 1 (2 x Drill Rate) 360.00 <br />Total 5373.04 <br />Drill Seed Cover Crop <br />D-SH Tractor + Operator f 61.30 <br />61.30/hr x 1.0 ac/hr <br />Drill Seeder 15.00 <br />15.00/hr x 1.00 ac/hr <br />• Sixrow Barley (20 lbs/ac) 4.00 <br />Total S 80.30 <br />