Laserfiche WebLink
• Revised, March 9, 2001 <br />SENECA COAL COMPANY <br />2001 RN-03-SENECA IIW <br />BOND EQUIPMENT AND LABOR COST ASSUMPTIONS <br />SUMMARY SHEET <br />Single Shift <br />Basis <br />14H MOTORGRADER COST SUMMARY <br />CDMG COST PER HOUR $108.77 <br />637E SCRAPER COST SUMMARY <br />CDMG COST PER HOUR $273.27 <br />992C LOADER COST SUMMARY <br />CDMG COST PER HOUR $201.23 <br />D11R DOZER W/O RIPPERS COST SUMMARY <br />CDMG COST PER HOUR $340.06 <br />• D3C DOZER COST SUMMARY <br />CDMG COST PER HOUR <br />$55 <br />28 <br /> . <br />D60K OVERBURDEN DRILL COST SUMMARY <br />CDMG COST PER HOUR $488.15 <br />5000 GALLON WATER TRUCK COST SUMMARY <br />CDMG COST PER HOUR $90.01 <br />LIGHT PLANT COST SUMMARY <br />CDMG COST PER HOUR $9.06 <br />(Excludes Operator) <br />GENERAL LABORER <br />CDMG COST PER HOUR $17.67 <br />D11R DOZER W/RIPPER <br />CDMG COS f PER HOUR $355.14 <br />Note: Rates are all inclusive-rent, labor, benefits, etc. and were supplied by DMG <br />• <br />25-1-40 Revised 03/01 <br />