Laserfiche WebLink
<br />SENECA COAL COMPANY <br />2001 RN-03-SENECA IIW <br />TERRACE CONSTRUCTION <br />MISCELLANEOUS RECLAMATION ACTIVITIES <br />DESCRIPTION: Terrace Construction along Haul and Access Roads <br />Equipment: 14H Motor Grader <br />Volume: The majority of the terraces will be built during construction <br />of the roads. We will estimate another 80 hrs. <br />Cost: 14H 108.77 /hr <br />Laborers $17.67 !hr <br />• <br />C J <br />80 hrs $126.44 /hr = <br />25-1-35 <br />$10,115 <br />Revised 03/01 <br />