Laserfiche WebLink
<br />SENECA COAL COMPANY <br />2001 RN-03-SENECA IIW <br />BACKFILL STOCKTANKS, REMOVE FLUMES <br />FACILITIES RECLAMATION ACTIVITIES <br />DESCRIPTION: Backfilling and grade 24 stocktanks <br />Equipment: D11N, U Blade <br />Volume: 24 tanks 4 hrs/tank <br />Cost: 96 hrs x $340.06 /hr <br />Total: $32,646 <br />DESCRIPTION: Remove flumes <br />Equipment: Backhoe, laborer <br />• Volume: 3 flumes <br />Cost: $59.62 Backhoe/hr $17.671abor/hr <br />Total: $1,855 <br />• <br />24 hrs <br />25-1-30 Revised 03/01 <br />