Laserfiche WebLink
• SENECA COAL COMPANY <br />2001 RN-03-SENECA IIW <br />HAUL SURFACE MATERIAL (Haul Road) <br />SUMMARY SHEET <br />VOLUME TO BE MOVED <br />SCRAPER FLEET COST <br />W(ft) <br />50 <br />EQUIPMENT UNITS <br />SCRAPER 4 <br />14H 1 <br />WATER TRK 1 <br />TOTAL COST <br />3 See FPC Worksheets <br />• <br />• <br />Hours (3) <br />108 <br />D(H) L(R) <br />1 60,970 112,907 LCY <br />157,879 tons <br />TOTAL EQUIP. <br />8 LABOR UNIT TOTAL <br />COST COST <br />$273.27 $1,093.08 /SCH HR <br />$75.66 $75.66 /SCH HR <br />$58.52 $58.52 /SCH HR <br />CosfMour <br />$1,227.26 <br />Total <br />$132,544 <br />25-1-22 <br />Revised 04/01 <br />