Laserfiche WebLink
• <br />SENECA COAL COMPANY <br />2001 RN-03-SENECA IIW <br />FACILITIES REGRADE COSTS <br />DOZER RIPPING <br />D71N DOZER PRODUCTION <br /> Area <br />Area Descripiton (AC) <br />Facilities Summary <br />9 Permanent Roads • Ripping NA <br />13 Haul Roads -Ripping NA <br />17 Rip Facilities Area -Ripping 17.5 <br />Substation 1.2 <br />Explosive Storage 2.8 <br />Shop Area 10.9 <br />Dragline Pad 2.6 <br />Total Acres 17.5 <br />• <br />Bank <br />Volume Width Depth Distance Ripping Ripping Dozer Costs Total Cost <br />(Bcy) (Feet) (Feet) (Feet) (Bcy/hr.) (Hours) ($/hr.) ($) <br />81,000 30.0 3 24,300 4,460 18 $355.14 $6,451 <br />338,722 50.0 3 60,970 4,460 76 $355.14 $26,975 <br />84,700 3 4,460 19 $356.14 $6,745 <br />RIPPING PRODUCTION <br />Cut Length Speed Tum Time Cycle Time PassesrFir Ripper Depth Cut Spacing Vol./Pass Ripping Prod. Utilization Ripping Prod. <br />(ft) (fUmin) (min) (miNpass) (60 min hr) (H) (il) (bcy/pass) (bcyrhr) (bcy/hr) <br />300 88 0.25 3.66 16.4 3 9.83 328 5373 0.83 4460 <br /> <br />25-1-19 Revised 04/01 <br />