Laserfiche WebLink
<br />SENECA COAL COMPANY <br />2001 RN-03-SENECA IIW <br />CONSTRUCT FINAL DRAINAGE CHANNEL <br />BACKFILL AND GRADING ACTIVITIES <br />DESCRIPTION: Lay Geotextile fabric, load and place riprap <br />Equipment: 992C Endloader, 2 laborers <br />• <br /> <br />Volume: Ditch L W <br />005-E1 - <br />005 - <br />006 4,000 <br />006-NE1 2,000 <br />006-NE2 800 <br />006-NE3 - <br />006-E1 500 <br />006-E2 400 <br />006-SE1 - <br />PM 2 - <br />PM 2A - <br />PM 3 1,200 <br />Total <br />Cost: Riprap - 2683 cy @ <br />Geotextile 10733 sy @ <br />25-1-10 <br />D <br />10 <br />10 <br />15 <br />6 <br />6 <br />6 <br />6 <br />6 <br />10 <br />12 <br />12 <br />12 <br />Total: <br />Fabric (sy) RipRap (cy) <br />0.75 6,667 1,667 <br />0.75 1,333 333 <br />0.75 533 133 <br />0.75 333 83 <br />0.75 267 67 <br />0.75 1,600 400 <br />10,733 2,683 <br />$36 / cy = $96,600 <br />$1.50 /sy $16,100 <br />$112,700 <br />Revised 03/01 <br />