Laserfiche WebLink
III IIIIIIIIIIIIIIII ~ • <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmenl of Natural Resources <br />1 S 13 Sherman 51., Roam 215 <br />Denver, Colorado 80203 <br />Phone (i03) 866-3567 <br />FAY: 1703) 832-8106 <br />February 18, 1998 <br />Dr. Donna J. Hinders <br />RE: Public Hearing on Siloam Stone's Bedrock Mine; Permit No. M-97-086 <br />Dear Dr. Hinders: <br />~~~~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Governor <br />lames S Lochhead <br />6ec W rve Dveuor <br />Michael fi. Long <br />Drvivon Uireaor <br />The Colorado Mined Land Reclamation Board will be conducting a Formal Public Hearing on <br />February 25, 1998 beginning at 11:00 a.m. The hearing will be held in Denver, Colorado at the <br />Centennial Building, which is located at 1313 Sherman Street, Room 318. The hearing is being <br />conducted to consider objections to S[aff's recommended approval, with conditions, of Permit <br />Application M-97-086 also known as the Bedrock Mine. <br />Although many letters of objection were received after expiration of the public comment period, <br />and are therefore not parties to the Formal Public Hearing ,these objectors will be given an <br />Opportunity to address the Board during the hearing. It may be preferable, given the limited time <br />(I 5 minutes) available for the public comment period, to have one or two speakers address the <br />Board with a collective summary of concerns. <br />Attached to this letter is a copy of the procedure that will be used to conduct the meeting. <br />If you have any questions about the hearing, procedures, or any item of concern about the <br />Bedrock Mine, please contact me at (303) 866-367. <br />Sincerely, <br />~~~~~~ <br />Anthony J. Waldron <br />Environmental Protection Specialist <br />Enclosure(s) <br />