My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE109955
DRMS
>
Back File Migration
>
Permit File
>
100000
>
PERMFILE109955
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:06:55 PM
Creation date
11/24/2007 7:12:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057A
IBM Index Class Name
Permit File
Doc Date
7/15/2005
Doc Name
As--Built Report Pond 016A and Pond 016 Two Pond System
Section_Exhibit Name
Tab 13 Attachment 13-5F
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• PREFACE <br />The Pond O16A and Pond 016 Two Pond system has developed and evolved in phases based on the <br />revisions in the mining configurations. The original plan anticipated that only the Wadge seam <br />would be mined and Pond 016 was constructed in the fall of 2000 to control runoff and sediment <br />from the mining disturbance. <br />In 2003 the mine plan was expanded to include nvuitg additional azea that included the Sage <br />Creek/Wolf Creek seams. In response to this new mine plan SCC designed and constructed a <br />second pond (016A) to operate in series with Pond 016 to effectively treat runoff from the increased <br />disturbance area. This pond was constructed in the summer of 2003. <br />In 2004, it was decided to cease mining at II-W at the end of 2005 or eazly 2006 due to the <br />increasingly difficult mining conditions being encountered. This derision resulted in a decrease in the <br />disturbance controlled by Pond 016A and Pond 016. During this mine plan revision, it was <br />determined that the emergenry spillway at Pond 016 was not at the elevation previously certified. <br />Therefore based on the reduced disturbance azea, SCC reran the SEDCAD demonstrations and <br />corrected the emergency spillway configuration to meet the current requirements and has included a <br />certification. <br />This attachment has been organized to include certified as-built reports for aVl phases of the <br />construction of this 2-pond system. Some of the reports will have reference to non-existent <br />attachments, but all the relevant required information is included in the appropriate appendices <br />within this Attachment. <br />• • Appendix 1, As-Built Report Sedimentation Stmcture Pond 016 <br />Pond 016 Spillway Certification (current condition) <br />- As-Built Report Pond 016 (construction) <br />- SEDCAD Demonstrations (current conditions) <br />- Stability Analysis of As-Built Conditions (Pond 016 construction) <br />Appendix 2, As-Built Report Sedimentation Structure Pond 016A <br />- As-Built Report Pond 016A (construction) <br />- SEDCAD Demonstrations (current conditions) <br />- Stability Analysis of As-Built Conditions (Pond O] 6A construction) <br />CJ <br />TR-53 Revised 6/05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.