Laserfiche WebLink
<br /> <br />lation of Topsoiling Costs: <br />~ent/Water Source pond <br />Area <br />red, non-lake area in Phase 1 <br />dy backfilled area in Phase 1 <br />>s Road <br />Total = <br />of topsoiling <br />e of topsoil needed <br />of topsoiling per cu yard <br />for topsoiling <br />4.34 acres <br />4 acres <br />3.3 acres <br />0 acres (already topsoiled) <br />0 acres (road to remain) <br />11.64 acres <br />0.5 feet (minimum) <br />253,519 cu ft <br />9,390 cu yards <br />$0.90 <br />$8,450.64 <br />ulation of Revegetation Costs: <br />nenUWater Source pond <br />Area <br />red, non-lake area in Phase 1 <br />dy backfilled area in Phase 1 <br />ss Road <br />~Ilaneous areas <br />per acre for seeding <br />for seeding <br />igement (weed control, etc) <br />for management <br />Estimated Revegetation Cost <br />18 acres <br />4 acres <br />3.3 acres <br />8.9 acres (already topsoiled) <br />0 acres (road to remain) <br />2 acres <br />36.2 acres <br />$85.00 <br />$3,077.00 <br />$25.00 per acre <br />$905.00 <br />$3,982.00 <br />