Laserfiche WebLink
Revised 3/22/94 <br />EXHIBIT D - Reclamation Plan (continued) <br />West End Gravel Company <br />Page -3- <br />The equipment required will be one twenty-yard scraper, <br />one 65 HP farm tractor, one disk, one seed drill, and one <br />fertilizer spreader or English Harrow. <br />The cost of such equipment on a contract basis is estimated <br />as follows: <br />20-Yard Scraper ..... ...............$100/hour <br />65 HP Farm Tractor w/Implements......$ 25/hour <br />Mobilization of Equipment to Site....$S00 <br />Equipment Utilization: <br />20-Yard Scraper............8 Hrs x $100/Hr = $ 800 <br />65 HP Farm Tractor <br />w/ Implements...........8 Hrs x $25/Hr = $ 200 <br />$1,000 <br />Mobilization ..............................$ 500 <br />Labor• <br />Hours of Labor .............16 Hrs x $10/Hr = $ 160 <br />Seed & Fertilizer..... $150/acre x 2 acres = $ 300 <br />Total Direct Cost ..............................$1,960 <br />Indirect Cost (15.8 of Total) .................$ 310 <br />TOTAL RECLAMATION COST .........................$2,270 <br />Sixteen hundred (1600) cubic yards of topsoil will be spread <br />on the affected two (2) acres (6" of topsoil average over area <br />of 87,120 square feet). <br />The topsoil will be hauled a maximum distance of 500 feet. <br />Unit Cost <br />Topsoil Application .............$0.86/Cubic Yard <br />Seed and Fertilizer <br />Acquisition and Application...$290/Acre <br />