Laserfiche WebLink
• Limitations: This report has been prepared in accordance with generally accepted soil and pavement <br />engineering practices in this azea for use by the client for design purposes. The conclusions and <br />recommendations submitted in this report are based upon the assumed traffic loadings and the data <br />obtained from the test holes advanced along the subject roadways. If during construction, soil and <br />ground water conditions pear [o be different from those described herein, this office should be advised <br />at once so that reev anon of the recommendations may be made. We recommend the on-site <br />observation of the sub ade proofrolling, gravel placement and compaction by a qualified soils engineer. <br />Sincerely, <br />NORTFIWEST _ SULTANTS, INC. <br />Brian D. I~VP.1~~75~ <br />L <br />• <br />Job No. 99-4004 Northwest Colorado Consultants, Inc. Page 6 <br />