Laserfiche WebLink
<br />~ STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER 'r'(r ElV~r, <br />Oi~~sion of Water Resources <br />Department o(Natural Resources t/UN 2 ~ r~/~C <br />131 i Shaman $;reeL Room 81 A 1995 <br />Denver, Colorado 80203 ~jiV/Sl <br />FA% 13071 Bfi6G358981 Oq OI 1v110E+ra(S 4 V e01p9Y <br />RESPONSE TO RECLAMATION PERMIT <br />APPLICATION CONSIDERATION <br />TO: Jim C. Stevens, Senior Environmental Protection Specialist <br />DMG #: M- 95- v1~ G SITE NAME: v ra <br />OF ~~~ <br />, 40 <br />`.1 ~. <br />'19]6 <br />Roy Rorner <br />cmrnnr <br />lames 5. tochhcad <br />E ~ecvlisr DIreC10r <br />I lal D. $impwn <br />State Engineer <br />0'7 - O 9'. <br />OPERATOR: l.~s~al' lou./fY COUNTY: (r.~rfcv <br />LANDOWNER: c ~1~cY CoK,v/,~ <br />,~ ~J <br />LOCATION: SEC: ~ TWP: z3 S. RNG: 7z ~/- PM: Goz WD: ~ DIV: Z <br />// CONDITIONS/STIPULATIONS FOR APPROVAL <br />v The proposed operation does not Prior to approving a gravel well <br />anticipate exposing ground water. 'ILerefore, no permit, the applicant will need a wavier of <br />exposure of ground water can occur during and objection from well owners within 600 feet <br />alter mining operations. or request a hearing before the Slate <br />Engineer. <br />"ILe proposed operation will consume <br />ground water by _ evaporation, _ dust <br />control, _ reclamation, _ and water <br />removed in the mined product. Prior to initiation <br />of these uses of ground water, the applicant will <br />need to obtain a gravel well permit. Prior to <br />obtaining a permit, an approved water supply <br />plan or a decreed plan for augmentation will be <br />required. <br />"Ibe apphcadt has indicated plans to use. <br />other water for uses at the gravel pit or for <br />storage in [he gravel pit. '[lte applign[ will need <br />to provide evidence to this office [ha[ [he water is <br />permitted or decreed for such uses. <br />COMMEN'I5: <br />7Le proposed operation may have <br />potential impact on existing water rights <br />near the project location. Please provide <br />evidence that the proposed project will not <br />alter or impact the historic operation of the <br />existing water rights. <br />Other: ~~ ~~11/I,/~+ ,~lvoi'lrNf <br />p ~ W C-Y / ~(l/fG b <br />DATE: J ocv7(i ~ ~ I /9~/S EVALUATOR: ~,. ~.i~( J~,~,~,, Ji~~ <br />cc: Division Z Office; M -95 -ozG File; <br />