Laserfiche WebLink
.., <br />Revised 11-10-82 <br />4.28.3 Performance Standards for Support Facilities not <br />• Located at the Minesite - Continued: <br />maintained for the duration of the loadout operations. <br />The perimeter of the loadout facility will be clearly <br />marked and there will be a sign on the topsoil stockpile <br />which states "Topsoil - Please Stay Off." <br />(2) Roads: <br />Not applicable <br />(3) Stream or channel realignments: <br />Not applicable <br />(4) Sediment control structures: <br />• The entire loadout facility will act as a sediment <br />control structure. All precipitation which falls on the <br />property will be detained on the property. A 10 year 24 <br />hour storm event would result in a maximum of 1 inch of <br />water standing over the entire property. All runoff <br />from surrounding lands will flow away from the property <br />as a result of the natural contours. There will be no <br />runoff or discharge from the Northgate site. <br />(5) Permanent impoundments associated with coal processing <br />plants: <br />Not applicable <br />(6) Use of water wells: <br />Not applicable <br />18 <br />