Laserfiche WebLink
<br />substantially from our estimates. Furthermore, the cost of each well is anticipated to <br />vary widely depending on topographical and geological features at the well site, its <br />location and drilling sequence within the mining panel, and its specific suitability for <br />reuse of infrastructure and equipment. <br />Notwithstanding the above, the estimated average cost of a fully developed solution <br />mining well, including well pad preparation, drilling, materials, supporting <br />infrastructure (surface piping), closure, and well pad reclamation is anticipated to range <br />Erom $250,000 to $400,000. Accordingly, using a figure of $350,000 per well: <br />• Well Field Development (Table ~ 3, initial 2b wells) <br />• Well Field Development (years 1 - 5, 50 new wells) <br />• Well Field Development (years 6 - 10, 75 new wells) <br />• 6Ve11 Field Development (years tl - l~, 75 new wells) <br />• Well Field Deve{opsrent (years 15 - 20, 75 new wells) <br />• Well Field Development (years 20- 25, 75 new wells) <br />• Well Field Development (years 25- 30, 7d new wells) <br />Subtotal for Well Field Development (total of 450 wells) <br />$10,777,617 <br />$17,500,000 <br />$26,250,000 <br />$26,250,000 <br />$26,250,000 <br />$26,250,000 <br />525,900.000 <br />$159,177,617 <br />Note that wells will be retired, closed, and reclaimed at about the same rate as they aze <br />being developed, so that, after initial startup, it is anticipated that about l5 wells will be <br />in production at any time, \vith an additional number ~•ither in the l~rocess of being <br />developed or in closure and reclamation. <br />It should be reiterated here that, depending on the project's success in fully developing <br />this Hurting technology, the number of wells and the actual cost per well may be <br />substantially different from those presented here. <br />Estimated Operating Costs <br />The annual operating costs for the entire l iceance Mining Operation, including the <br />solution mining operations and the initial processing facility, are estimated to range <br />from 56.0 to $8.0 million dollars. <br />Uperatm4 to>u and Wdl Rcld Inv,r,ment l.wta 7.7 <br />Rio Blarco ~ounrv Addiuaful Imanruuun Hcuucat <br />f',tearce Mtnmp ~lperatton <br />,\mnsan soda. L.L.P. <br />