Laserfiche WebLink
.. <br />I•D4IIDIT c, 1, .1 <br />RDCLJ~MATION PLAN <br />BAR'I'1,EY GRAVII. PIT (1 12 ) <br />Sec. 15, T. 40 N., R. 19 W., N.M.P.M. <br />Following excavation, each worked area of the pit will be <br />smoothed to the finish contour, including 3:1 slopebanks and <br />the flat west-sloping pit floor. Top soiling will be delayed <br />until closure of the permitted operation to allow use of the <br />werked-out areas for processing and stockpiling of sandstone <br />gravel materials. <br />After completion of ,all gravel ~,it op,rations or. tn~ ~,~t,, <br />the stockpilcad soil. o:~crburden and top soil will fr s~ncar? <br />evenly over the sm~rothed surface. The pre~~ared top coal will <br />then lie fertilized, seeded and weed controlled according to <br />the following recrnrtr~ndation from U. S.D.A., Soil Conservation <br />Service, to provide far sustained dry land grazing range land. <br />