V 01
<br />GRAPHIC SCALE
<br />500 0 250 500 1000
<br />IN FEET
<br />�� �'� \' )
<br />,�,q�j ° 1 inch = 500 ft.
<br />FRESHWATER POND
<br />CONTOUR INTERVAL = 5'
<br />Sy (APPROX. 5 ACRES)
<br />\° (SEE NOTE 7)
<br />yD" / �g //
<br />PROPOSED ACC
<br />v PROPOSED VEGETATION �
<br />LOODP MINING SUBJECT TO
<br />A
<br />APPROPRIATRIAT E APPROVALS
<br />R RECOVERY OF CONSTRUCTION
<br />FP ,, MATERIALS TO NEAR - VERTICAL
<br />SLOPES (SEE DETAIL)
<br />EXISTING RIPARIAN CANOPY
<br />\_,y� 11X•" 0 \ I J' ,. '� \1
<br />E }
<br />�j/ o "� \' ��,. aw^,r r we 'R- -Q!i�✓ �_' .- + \ .'" ;r'- •".` ".'.`°y..��
<br />x 5279 �p 4 ^+ \'. t ` �,,c -_- - WETLAND AVOIDANCE
<br />It 25' BUFFER
<br />\ , / y♦ / e (SEE NOTE 5)
<br />It I
<br />SCREENING BERM MADE FROM `
<br />OVERBURDEN FROM LLS 1 -3 9 I [ \ \
<br />90
<br />WITH 2SLOPES \ \
<br />ACCESS ROAD \ � C , / �\� \\\ ; � l.. -597.j.(_._- .- �.�,;..?•`� :\ \ i' [' � ��6 `\
<br />to
<br />PROCEgING AREA °i,� _ \ \ `, ♦ ' \.
<br />SILTATION AREA \ PHALSE I \�
<br />(FOLLOWING RESOURCE EXTRACTION) \ °i \ t (L.� M V j
<br />v ♦c vv AG � •� :( \. ems. �•'
<br />(194.3 A ES)
<br />25' SETBACK TYP. \ •\ `\ I{ ® x \`\ "`/
<br />(SEE NOTE 5) a \ 0�\ \ t �� °G• 4
<br />\ \
<br />" i
<br />\ \\ ♦° \ \`�� ,\ it \ \IO �.\ O: 1 0 \G- i '
<br />75' SETBACK BETWEEN MINED`
<br />SLOPES AND STOCKPILES n
<br />SCREENING BERM MADE FROM s \ "\ c \ CONVEYOR S 1' -I �' LT
<br />OVERBURDEN FROM INITIAL MINING \ \ \ OVER DRAINAGE' \'r ♦ \'t I m�
<br />CELLS WITH 2:1 SLOPES
<br />\\\ \ \ \ V
<br />\ `iy
<br />\ / iii
<br />�-I
<br />oto
<br />j v it �i( v ♦v x �c
<br />! h u t
<br />bb
<br />1 \
<br />1 PH E;AU B
<br />(194J ORES)
<br />ACCESS ROAD AND CONVEYOR
<br />FP — IT y (SEE NOTE 6) {
<br />e" \ \ \ I \ i I"' % � y'-� �} �� � mac: \t ♦ �, c
<br />�m w > ♦ 1
<br />V - }
<br />LAND OWNER MAY MAINTAIN
<br />LIVESTOCK OPERATIONS SO °
<br />LONG AS FEASIBLE lu
<br />DEWATERING TRENCH (AS NEEDED) I ` o t
<br />MINE TO NEAR VERTICAL SLOPES TO
<br />OPTIMIZE RESOURCE RECOVERY \` 120' SETBACK FROM UTILITY EMENT
<br />SIDE SLOPES SUBJECT TO CONCURRENT "` MINE TO FINAL RECLAMATION LOPES
<br />RECLAMATION (SEE NOTES) �-� WTI_ -J - / ` } / ADJACENT TO LATTICE TO RS
<br />AD
<br />PIT FLOOR AT APPROX. 25' DEPTH ' �-
<br />OHU-- OHU >L OHU -0HU— OHU— a
<br />/ U OHU -. OHU
<br />8pp =
<br />BACK FILL OR SAND AND CHU® ONUS olta— onU= wa epu= Bpd B bpd= \ /
<br />GRAVEL LEFT IN PLACE1 \ �+
<br />(SEE NOTE 2) \ 120' SETBACK UTILITY EASEMENT 1 T
<br />MINE TO FINAL R LAMATION SLOPES 1�
<br />SHALE BEDROCK' __-
<br />NOTES:
<br />1.CONCURRENT RECLAMATION WILL OCCUR AS OVERBURDEN MATERIALS
<br />ARE MOVED FROM FUTURE MINING AREAS. THE OPERATOR MAY REPLACE
<br />MATERIAL IN SIDE SLOPE OR IN LIFTS TO OTHER FINAL GRADING, AS
<br />INDICATED ON EXHIBIT F.
<br />2 THE OPERATOR MAY MINE TO FINISHED SLOPES OR REPLACE
<br />OVERBURDEN IN TEMPORARY BACKFILL FEATURES, CONTAINMENT FOR
<br />SILTATION PONDS AND OTHER WATER MANAGEMENT FEATURES.
<br />TYPICAL EXCAVATION SIDE SLOPE
<br />NOT TO SCALE
<br />SEED SEED
<br />6" TRENCH TO
<br />COLLECT SEDIMENT
<br />NOTE: A SUFFICIENT QUANTITY OF TOPSOIL
<br />SHALL BE STOCKPILED TO ACHIEVE FINAL
<br />RECLAMATION, AS SHOWN ON EXHIBIT F,
<br />WITH 6- INCHES OF TOPSOIL ON ALL
<br />RECLAIMED LAND SURFACE AREAS.
<br />OVERBURDEN / TOPSOIL STOCKPILES DETAIL
<br />NOT TO SCALE
<br />\
<br />SCREENING BERMS
<br />ADJACENT TO 'IT ICE TOWERS
<br />PHASE A
<br />�\ (39.5 AC S) / I
<br />\ \ \fit � - _..._..._.- -- • -.:
<br />`1) l
<br />1
<br />C
<br />EMERGENCY ACCESS ROUTE
<br />(OLD PUEBLO ROAD)
<br />I/
<br />ICI
<br />it
<br />1il
<br />POTENTIAL DEWATERING TRENCH
<br />POTENTIAL 6 -8' SCREENING BERM
<br />Perrmt # D - 073 Confidential?
<br />Class Lt/ sG7 / Type Se
<br />GENERAL NOTES: MV# Inspection Date
<br />1. BASE INFORMATION TAKEN FROM TOPOGRAPHICAL SURVEY MAINTAIN AN ACCESS ROAD AND CONVEYOR EQUIPMENT Doc Date (if no date ztamp) OF THE SUNDANCE PROPERTIES BY OBERING, WURTH R THROUGH THE APPROXIMATE CENTER OF THE MINE AREAS. Doc Name
<br />ASSOCIATES, DATED FEB. 12, 2006 AND REVISED JUNE ALIGNMENT MAY BE ADJUSTED AS MINING PROCEEDS TO From DRMS /Other /I
<br />28, 2006. ACCOUNT FOR VARIOUS MINING AND RECLAMATION To DRMS /Other
<br />ACTIVITIES. Rectpie
<br />2.FLOODPLAIN INFORMATION SHOWN FROM FLOOD INSURANCE
<br />RATE MAPS FIRM PANEL NUMBERS; 08041C1160 F, 7.FRESHWATER POND. ALL STORMWATER FROM DISTURBED
<br />08041CI170 F. 08041CIISO F AND 0804161190 F, ALL AREAS WILL BE DIRECTED TO THE FRESHWATER POND FOR
<br />WITH AN EFFECTIVE DATE OF MARCH 17, 1997. BASE DETENTION AND WATER QUALITY PURPOSES. THE
<br />FLOOD ELEVATIONS NOT SHOWN. ZONES A AND AE ARE FRESHWATER POND WILL ALSO CONTAIN ADEQUATE VOLUME
<br />REGULATED BY EL PASO COUNTY, COLORADO. ZONE X IS TO STORE AND CLARIFY DEWATERING WATER PRIOR TO PREPARED UNDER THE SUPERVISION OF:
<br />NOT REGULATED. DISCHARGE.
<br />3.011. / GAS WELL LOCATION FROM COLORADO OIL AND GAS B.DEWATERING PROCESS. TRENCHES OR PIPES WILL BE USED
<br />CONSERVATION COMMISSION GIS WEBSITE. TO CONVEY PUMPED WATER TO THE FRESHWATER POND
<br />FOR CLARIFICATION, THEN CONSUMPTIVE USE OR
<br />4. TEMPORARY NATIVE GRASS SEED MIXTURE WILL BE USED DISCHARGE. ALL DEPLETION OF GROUNDWATER WILL BE /
<br />AS A COVER CROP FOR ALL STOCKPILES TO REMAIN IN ACCOUNTED FOR BY A PLAN OF AUGMENTATION OR 5� _ ZL22A y np 1�7
<br />PLACE FOR ONE YEAR OR LONGER. SUBSTITUTE WATER SUPPLY. NAME I K)DATE =T
<br />5. WETLAND BUFFERS. THE OPERATOR WILL AVOID IMPACTS 9.THE OPERATOR WILL STRIP AND STOCKPILE TOPSOIL AND
<br />TO EXISTING WETLANDS. AS ILLUSTRATED, A SETBACK OF OVERBURDEN FROM THE PROCESSING AREA PRIOR TO THE
<br />AT LEAST 25 FEET WILL BE MAINTAINED BETWEEN ALL COMMENCEMENT OF MINING. RECOVERY OF MATERIAL 1
<br />MINING RELATED ACTIVITIES AND JURISDICTIONAL WITHIN THE FOOTPRINT OF THE FRESHWATER POND WILL TITLE
<br />WETLANDS. THEN TAKE PLACE, WITH SOME OVERBURDEN TO BE
<br />BACKFILLED TO ACHIEVE FUNCTIONAL GRADING WITH THE
<br />6. ACCESS ROAD AND CONVEYOR. THE OPERATOR WILL FRESHWATER POND.
<br />REVISED EXHIBIT C -2: MINE PLAN MAP
<br />PREPARED BY: APPLICANT: PROJECT:
<br />00 BANKS AND GESSO, LLC. LAFARGE, NORTH AMERICA SUNDANCE
<br />■■ 720 KIPLING ST., SUITE 117 10170 CURCH RANCH WAY, SUITE 200 SAND AND GRAVEL RESOURCE
<br />LAKEWOOD, COLORADO 80215 WESTMINSTER, CO 80021 EL PASO COUNTY
<br />(303) 274 -4277 FOUNTAIN, CO
<br />JOB NO DATE SCALE DRAWN BY DESIGNED BY APPROVAL REV SHEET
<br />06015 4/4/07 1" =500' DRF 1
<br />LEGEND
<br />SECTION LINE
<br />- -
<br />DITCH / WATERWAY
<br />PERMIT BOUNDARY
<br />EXISTING RIPARIAN CANOPY
<br />EASEMENT / R.O.W.
<br />EXISTING INDEX CONTOUR
<br />- — — — — — — - MINING LIMITS
<br />EXISTING INTERMEDIATE CONTOUR
<br />PAVED ROAD
<br />PROPOSED INDEX MINING CONTOUR
<br />UNPAVED ROAD
<br />PROPOSED INTERMEDIATE MINING CONTOUR
<br />PROPOSED ACCESS
<br />o
<br />PROPOSED VEGETATION
<br />rrrr RAIL ROAD
<br />E-1
<br />EXISTING STRUCTURE
<br />FENCE
<br />®
<br />EXISTING WATER WELL
<br />mu— OHu o u— wu OHu— OVERHEAD POWER LINE
<br />C
<br />ACCESS EASEMENT
<br />w — w w — w w — UNDERGROUND WATER LINE
<br />E FP — FP
<br />— FP —
<br />FP — IT — fP J
<br />100 -YR FLOODPLAIN
<br />UcU ucu ucu ucu— ueu UNDERGROUND UTILITY LINE
<br />.- u — as —
<br />m —
<br />of — ae — dA
<br />JURISDICTIONAL WETLANDS
<br />cescas — cesrrs —ws UNDERGROUND GAS LINE
<br />1il
<br />POTENTIAL DEWATERING TRENCH
<br />POTENTIAL 6 -8' SCREENING BERM
<br />Perrmt # D - 073 Confidential?
<br />Class Lt/ sG7 / Type Se
<br />GENERAL NOTES: MV# Inspection Date
<br />1. BASE INFORMATION TAKEN FROM TOPOGRAPHICAL SURVEY MAINTAIN AN ACCESS ROAD AND CONVEYOR EQUIPMENT Doc Date (if no date ztamp) OF THE SUNDANCE PROPERTIES BY OBERING, WURTH R THROUGH THE APPROXIMATE CENTER OF THE MINE AREAS. Doc Name
<br />ASSOCIATES, DATED FEB. 12, 2006 AND REVISED JUNE ALIGNMENT MAY BE ADJUSTED AS MINING PROCEEDS TO From DRMS /Other /I
<br />28, 2006. ACCOUNT FOR VARIOUS MINING AND RECLAMATION To DRMS /Other
<br />ACTIVITIES. Rectpie
<br />2.FLOODPLAIN INFORMATION SHOWN FROM FLOOD INSURANCE
<br />RATE MAPS FIRM PANEL NUMBERS; 08041C1160 F, 7.FRESHWATER POND. ALL STORMWATER FROM DISTURBED
<br />08041CI170 F. 08041CIISO F AND 0804161190 F, ALL AREAS WILL BE DIRECTED TO THE FRESHWATER POND FOR
<br />WITH AN EFFECTIVE DATE OF MARCH 17, 1997. BASE DETENTION AND WATER QUALITY PURPOSES. THE
<br />FLOOD ELEVATIONS NOT SHOWN. ZONES A AND AE ARE FRESHWATER POND WILL ALSO CONTAIN ADEQUATE VOLUME
<br />REGULATED BY EL PASO COUNTY, COLORADO. ZONE X IS TO STORE AND CLARIFY DEWATERING WATER PRIOR TO PREPARED UNDER THE SUPERVISION OF:
<br />NOT REGULATED. DISCHARGE.
<br />3.011. / GAS WELL LOCATION FROM COLORADO OIL AND GAS B.DEWATERING PROCESS. TRENCHES OR PIPES WILL BE USED
<br />CONSERVATION COMMISSION GIS WEBSITE. TO CONVEY PUMPED WATER TO THE FRESHWATER POND
<br />FOR CLARIFICATION, THEN CONSUMPTIVE USE OR
<br />4. TEMPORARY NATIVE GRASS SEED MIXTURE WILL BE USED DISCHARGE. ALL DEPLETION OF GROUNDWATER WILL BE /
<br />AS A COVER CROP FOR ALL STOCKPILES TO REMAIN IN ACCOUNTED FOR BY A PLAN OF AUGMENTATION OR 5� _ ZL22A y np 1�7
<br />PLACE FOR ONE YEAR OR LONGER. SUBSTITUTE WATER SUPPLY. NAME I K)DATE =T
<br />5. WETLAND BUFFERS. THE OPERATOR WILL AVOID IMPACTS 9.THE OPERATOR WILL STRIP AND STOCKPILE TOPSOIL AND
<br />TO EXISTING WETLANDS. AS ILLUSTRATED, A SETBACK OF OVERBURDEN FROM THE PROCESSING AREA PRIOR TO THE
<br />AT LEAST 25 FEET WILL BE MAINTAINED BETWEEN ALL COMMENCEMENT OF MINING. RECOVERY OF MATERIAL 1
<br />MINING RELATED ACTIVITIES AND JURISDICTIONAL WITHIN THE FOOTPRINT OF THE FRESHWATER POND WILL TITLE
<br />WETLANDS. THEN TAKE PLACE, WITH SOME OVERBURDEN TO BE
<br />BACKFILLED TO ACHIEVE FUNCTIONAL GRADING WITH THE
<br />6. ACCESS ROAD AND CONVEYOR. THE OPERATOR WILL FRESHWATER POND.
<br />REVISED EXHIBIT C -2: MINE PLAN MAP
<br />PREPARED BY: APPLICANT: PROJECT:
<br />00 BANKS AND GESSO, LLC. LAFARGE, NORTH AMERICA SUNDANCE
<br />■■ 720 KIPLING ST., SUITE 117 10170 CURCH RANCH WAY, SUITE 200 SAND AND GRAVEL RESOURCE
<br />LAKEWOOD, COLORADO 80215 WESTMINSTER, CO 80021 EL PASO COUNTY
<br />(303) 274 -4277 FOUNTAIN, CO
<br />JOB NO DATE SCALE DRAWN BY DESIGNED BY APPROVAL REV SHEET
<br />06015 4/4/07 1" =500' DRF 1
<br />
|