Laserfiche WebLink
q <br /> <br />MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />1313 Sherman St.. Room 275 <br />Denver, CO 80203 <br />303 8663567 <br />Fnx~303 832-8706 <br />July 17, 1991 <br />III III IIIIII IIII III J <br />999 <br />Mr. Edgar Pratt <br />Kit Carson County <br />P.O. Box 249 <br />Burlington, Colorado 80807 <br />RE: File No. M-91-069, Heintges Pit, Permit Issuance <br />Dear Mr. Pratt: <br />OF COLORADO <br />F ~O~ <br />r.~ ,'p!p <br />Nc~ ~\ O <br />y ,o ~ <br />~ 1876 ~ <br />Rq Romer. <br />Govemar <br />Fred R. Banta, <br />Division Director <br />On July 10, 1991, the Mined Land Reclamation Division found Kit Carson County <br />to have satisfied the applicable requirements of C.R.S. 34-32-101 et sec. for <br />obtaining a mining and reclamation permit. Therefore, a permit is being <br />issued. Two signed originals of the permit have been executed. We have kept <br />one copy for our files and are enclosing one copy for your use. Please read <br />the terms of the permit. It is your responsibility to comply with all of the <br />terms of the permit. As a reminder, here are a few things we feel are <br />important. <br />1. All of the original application materials, as amended and supplemented, <br />are an integral part of your permit. They have been incorporated into the <br />permit by reference. We presume that you have a copy of all of these <br />materials; therefore, none have been enclosed with this mailing. We suggest <br />that you keep a copy of the permit and the permit application at the mining <br />operation as a reference for operating personnel, to help ensure compliance <br />with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those <br />described in the permit may require a revision to the permit. We suggest <br />consulting the Minerals Rules and Regulations and/or contacting us to <br />determine if a revision to the permit is necessary. Rule 1.8 pertains to <br />Amendments, Rule 1.9 to Technical Revisions, and Rule 1.10 to Conversions. <br />3. On your permit anniversary date each year, July 10, you must submit an <br />annual fee and an annual report to us. The annual fee for this permit is <br />$120.00. Please consult Rule 3.4 for 110 Permits, Rule 2.4 for 112 Permits, <br />and Statute Section 34-32-116(1>(a) for 111 Permits, for the specific annual <br />report requirements applicable to your mine. <br />If you have an questions, please contact me. <br />Since~y,~ <br />^'r ! `'~ <br />J A. PENDLETON <br />sting Division Director <br />JAP/BK/DLM/eke/3274G <br />Enclosure <br /> <br />