Laserfiche WebLink
• ROCKCASTLE COAL COS@ANY <br />ORASSY CREEK MINE: POLO ~ AREA <br />UNR COST REVEOETATNNI <br />SEEDBED PREPARATION <br />EQUIPMENT REQUIRED: <br />JOHN DEERE TRACTOR <br />-DISC <br />PROOUCTNrrv <br />DISCING 7.6 ACMR <br />EQUIPMENT UNR COSTS <br />TRACTOR 524.96 /HR <br />DISC 55.00 /HA <br />UNR COST <br /> 516.72 /AC <br />SEEDING AND FERi1LIZATION <br />EQUIPMENT REQUIRED: <br />JOHN DEERE TRACTOR <br />SEEDER <br />PRODUCTNfTY <br />SEEDING 1.5 AC/HR <br />EQUIPMENT UNR COSTS <br />TRACTOR 524.96 /HR <br />SEEDER 59.94 MR <br />UNR COST <br />TRACTOR 516.64 /AC <br />SEEDER 56.63 /AC <br />LABOR 58.80 /AC <br />SEED 555.77 /AC <br />FERTILIZER 543.20 /AC <br />• SUBTOTAL 587.63 /AC <br />MULCHING AND CRIMPING <br />EQUIPMENT REQUIRED: <br />JOHN DEERE TRACTOR <br />-MULCHER <br />-DISC <br />PRODUCTNRY <br />MULCHING 0.8 ACMR <br />CRIMPING 5.5 AC/HR <br />EQUIPMENT UNR COSTS <br />TRACTOR 524.96 /HR <br />MULCHER 53.56 MR <br />DISC 55.00 MR <br />UNR COST <br />TRACTOR AND MULCHER 536.65 /AC <br />LABOR (3 laborers) 548.37 /AC <br />MULCH 5780.00 !AC <br />TRACTOR AND DISC 55.45 <br /> SUBTOTAL 5264.02 /AC <br />TOTAL REVEGETATION UNR COST 5370.37 /AC <br />NOTES: <br />• Reclamation unit rates are based on roceM reclamation work. <br />• <br />