Laserfiche WebLink
TABLE ~ <br /> ROCKCASTLE COAL COMPANY <br /> GRASSY CREEK MINE: POND ~ AREA <br />• MOBILDATION I DEMOBILRATION <br />EQUIPMENT EQUIPMENT OWNERSHIP TRANSPORT COST TOTAL <br />TYPE UNRS COST LOADED UNLOADED COST <br /> (SMR7 (SMFp (SIHFp <br />lY900ZER i 547.67 57(1.85 567.78 5333 <br />16G MOTOR GRADER 1 534.58 5101.76 567.18 5301 <br />FARM TRACTOR AND MULCHER 1 53.75 570.93 567.18 5237 <br />• <br />TIiANSPORi TIME: <br />Mobilization time = (t5 mi./25 mph, Mob.)+(0.5 hr., Unk>ad) 7.10 hrs <br />Retum time = (15 mi./ 25mph, trdn she to yard) 0.60 hrs <br />7.70 hrs <br />Travel time = (15 mi./25mph, hom yard to site) 0.60 hrs <br />DemoGlization time = (0.5 hr., Land)+(15 mi./25mph, Demob.) 7.70 hrs <br />1.70 hrs <br />TOTAL MOBILIZATION/DEMOBILIZATION COST: 5874 <br />NOTES: <br />-Transport costs were obtained from CRG for a diesel powered tractor (55,000-75,000 gvw) <br />end a fixed gooseneck, drop deck trailer (120 ton capacity) <br />-Mileage figure was obtained lrom Rand McNally Road Atlea assuming equipmem will be <br />transported hom Hayden, Cokxado to the she. <br />• <br />